Pleasant Park: what the record says about its purpose and its one way in
Pleasant Park was planned as both a home for local field programs and a tournament venue, and its single entrance was flagged before it was designed. Here is the record, year by year, and where the access study stood after its Nov. 10 update to Council.
Two questions
What the record actually says
Claims have circulated about why the park was built and when the access problem first came up. Pick a question to see the dated documents.
Both: local fields and tournaments, from the start
Every planning document from 2013 to the 2017 bond names two goals: meet Apex's own field needs and host tournaments.
The parks master plan's long-term needs include a 60–100 acre sports complex that can “not only meet active recreation needs, but also serve as an economic tournament venue for the town.”
Council approved buying the 92.16-acre Progressive Farms property, 5–0. Staff said it met the master plan's goal of significant parkland in the southwest quadrant and addressed current and future program needs.
Before the bond vote, the Town's Pleasant Park page described both: fields that expand softball, baseball, tennis, soccer and lacrosse programs, and a tournament facility, “allowing Apex athletes to stay and play.”
December 2015, before the design was chosen
The single entrance across the CSX rail line was raised at the first concept presentation, and the 2017 bond materials counted a second entrance among the site's offsite challenges.
Presenting concept plans, the Town's design consultant (WithersRavenel) said:
“There is only one egress in and out, and they realize this is not ideal. This will absolutely need to be addressed later in the process.”
Council approved Concept 1, 5–0; the minutes note, “Traffic needs to be addressed but in the future.”
The 2017 Parks Bond FAQ, posted before the vote, explained the park's cost:
“Pleasant Park is a rolling 92-acre site with streams, wetlands, and a single access across a CSX rail corridor. This site presents significant challenges with regards to offsite roadways improvements (including providing a second entrance), utility connections, and site work. The proposed budget includes over $4M to deal with those issues alone.”
Terry Mahaffey joined the Town Council; construction on the park had already started. COVID hit almost immediately, and progress on both the park and a second entrance slowed to a crawl. The park finally opened in late 2023.
Council adopted the Western Big Branch Area Plan, which calls for a feasibility study of a grade-separated crossing at NC 540 or S. Salem Street to improve access to Pleasant Park.
The place
Between the railroad and NC 540
The park sits south of Old US 1 and the CSX line, with NC 540 on its east side. Its single entrance crosses the rail corridor. The access study's own map shows the options it is weighing, including a crossing just north of the park toward S. Salem Street and one across NC 540.
Marker locations are approximate. Map data © OpenStreetMap contributors.
Opening and after
From opening day to the access study
-
1
Nov. 4, 2023
The park opens with one way in
In its first week, the park averaged 8,000 to 10,000 people a day, the interim Town Manager told Council.
Approved minutes, Nov. 14, 20232023 minutes (PDF, p. 848) ↗ -
2
June 17, 2025 · Council work session
“Getting a second access point is number one”
As Council chose a design for the park's second phase, Councilmember Terry Mahaffey said access was his primary concern: of two issues, “parking is number two and getting a second access point is number one.”
Approved minutes, June 17, 20252025 minutes (PDF, p. 538) ↗ -
3
Mar. 10, 2026 · Council meeting
Council approves the access study, 5–0
On Mayor Pro Tem Mahaffey's motion, Council approved the consent agenda, including an interlocal agreement with CAMPO, the region's transportation planning organization, to study up to five potential multimodal access points. The study costs $150,000, split evenly between the Town and CAMPO; the consultant is VHB.
Approved minutes, Mar. 10, 2026 (CN1)2026 minutes (PDF, p. 192) ↗ -
4
Nov. 10, 2026 · Council meeting, item PR5
The study team reports back
Town planning staff and VHB, the study's consultant, presented the first round of public input. Six performance measures will score each option: cost and funding, constructibility, connectivity, neighborhood impacts, operations and environmental impacts. At the Sept. 3 public meeting, residents ranked neighborhood impacts most important, followed by connectivity and operations, and those rankings will help weight the scoring. The team said its 10% concept designs were being finalized to feed cost estimates. The item was informational; no option was chosen.
Pleasant Park Access Study update, Town Council, Nov. 10, 2026 (from 1:27:31). Video: Town of Apex Council agenda item PR5, Nov. 10, 2026 (packet p. 508)PR5 coversheet (PDF) ↗
Where it stands
The study, step by step
The study will evaluate up to five potential new access points and recommend one for future funding. It is a feasibility study: funding has not been identified for design or construction.
- ✓Existing conditions analysis & public meeting #1Sept. 3, 2026, Apex Town Hall
- ✓Performance measures set; update to Planning Board and Town CouncilNov. 9 and Nov. 10, 2026
- →10% concept designs, cost estimates & scoringBeing finalized at the time of the Nov. 10 presentation
- 4Public meeting #2Jan. 27, 2027
- 5Draft study reportExpected March 2027
- 6Final report and recommended access pointStudy wraps up May 2027
How to weigh in
Second public meeting: Jan. 27, 2027
The study team will show concept designs at the second public meeting on Jan. 27, 2027. Residents can follow the study, sign up for updates and comment on the project website. The Town posts status updates on its Feasibility Studies page.